(1)
IMPLEMENTASI PROSEDUR KERJA APRON MOVEMENT CONTROL (AMC) DALAM MENANGANI TUMPAHAN AVTUR DI AREA APRON BANDAR UDARA RADIN INTEN II LAMPUNG. kohesi 2025, 8 (11), 151-160. https://doi.org/10.2238/2258yv64.