(1)
WAKTU SIKLUS PEMANCANGAN SPUN PILE MENGGUNAKAN JACK-IN PILE JENIS HIDROULIC STATIC PILE DRIVER PADA PROYEK PEMBANGUNAN GEDUNG BERTINGKAT. kohesi 2025, 8 (1), 121-130. https://doi.org/10.2238/wqxsn202.