1.
IMPLEMENTASI PROSEDUR KERJA APRON MOVEMENT CONTROL (AMC) DALAM MENANGANI TUMPAHAN AVTUR DI AREA APRON BANDAR UDARA RADIN INTEN II LAMPUNG. kohesi. 2025;8(11):151-160. doi:10.2238/2258yv64