[1]
“IMPLEMENTASI PROSEDUR KERJA APRON MOVEMENT CONTROL (AMC) DALAM MENANGANI TUMPAHAN AVTUR DI AREA APRON BANDAR UDARA RADIN INTEN II LAMPUNG”, kohesi, vol. 8, no. 11, pp. 151–160, Jul. 2025, doi: 10.2238/2258yv64.